IER-Campus

Pays :

Vietnam

Domaine :

Architecture

Durée du projet :

2004-2005

Titre du projet :

IER-New Campus HCMC

Partenaire

Organisme :

Vietnam National University

Département :

IER-Institute of Environment and Ressources

Adresse :

142 To Hien Thanh St. Dist 10 Hochiminh City

Responsable :

Prof. Huynh Thi Minh Hang

Collaborateurs :

Mme Thanh Thuy

EPFL

Institut :

IA

Laboratoire :

LCC

Faculté :

ENAC

Adresse :

BP, Station 16

Responsable :

Profs Morel et Ortelli

E-mail :

claude.morel@epfl.ch luca.ortelli@epfl.ch

Descriptif

STAGE 1: CONCEPT DESIGN (3 months)

All feasibility studies, spaces and volumes organization, functionality of different parts of your Institute, site plan and landscaping, planning of construction, energy concept and special equipments.

At the end of this stage, a travel to HCMC will be organized in order to present the concept design to your staff for corrections and approval. The scale of it will be 1:500 and 1:200 (design of each floor, sections and general volumes, master plan).

STAGE 2: BASIC DESIGN (2 months)

Details of conception, organization of your departments, administration offices and research and learning surfaces, design of the building and landscape (floors, sections, general views). The scale of this sketch will be 1:200. At the end of this stage a travel to HCMC will be organized in order to present and discuss the basic project with your staff and the Institute of Research and Design Schools. The goal to reach will be the approval of first basic design with developments.

STAGE 3: FINAL BASIC DESIGN (1 month)

File of all design with model, scale 1:200. At the end of this stage a travel to HCMC will be organized in order to present the results of the studies to: Ministry of Natural Resources and Environment (MONRE), Vietnam National University (VNU-HCMC), Institute of Research and Training and Institute of Research and Design of Schools.

Publications

Rapport I, Phase I: Concept Design. 27.9.2005